Gold Member Since 2011
Audited Supplier
Shenzhen LEDSolution Technology Co., Ltd.

LED Tunnel Light, Industrial LED Light, 100W LED Tunnel Light manufacturer / supplier in China, offering 80W 100W 150W 200W 240W Tunnel Building Construction Lighting LED Tunnel Light, P6.25 High Resolution Interactive LED Dance Floor, Ledsolution P6 Ultra Light Indoor Outdoor Rental LED Display and so on.

(/ )

Supplier Homepage Product LED Tunnel Light 80W 100W 150W 200W 240W Tunnel Building Construction Lighting LED Tunnel Light

80W 100W 150W 200W 240W Tunnel Building Construction Lighting LED Tunnel Light

FOB Price: US $159-259 / Piece
Min. Order: 2 Pieces
Min. Order FOB Price
2 Pieces US $159-259/ Piece
Get Latest Price
Production Capacity: 5000PCS/Month
Transport Package: Each One Packed in a Box
Payment Terms: L/C, T/T, Paypal, Money Gram, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: M3
  • Lamp Body Material: Aluminum Alloy
  • Beam Angle: 90,Bat Wing
  • Lifespan: >50000 hours
  • Certification: BV, CCC, CE, FCC, RoHS, UL
  • With Light Source: With Light Source
  • Luminous Efficacy: 95~105 Lm/W
  • Driver Efficacy: 91%
  • Cct: 3000,4000,5000,6000(K)
  • Operation Temperature: -40~+50
  • Production Size: 325*155*245mm
  • Specification: CE, RoHS, ISO, UL certificates
  • HS Code: 9405409000
  • Color Temperature: Warm White, Pure White, Cool White
  • IP Rating: IP68
  • Housing Color: Black, Gray
  • Warranty: 5 Years
  • Voltage: AC100~277V
  • Power: 80W, 100W, 120W, 150W, 160W, 180W, 200W, 240W
  • Power Factor: 0.95
  • LED Type: Philips Lumileds Luxeon Tx
  • CRI: >75
  • Relative Humidity: 10%~90%
  • Trademark: LEDSOLUTON
  • Origin: Guangdong, China
Product Description
               80W 100W 150W 200W 240W tunnel building construction lighting outdoor led tunnel light
   

Electrical and Photometric Specification of M3 Led tunnel light
ModelInput Voltage
(V)
Drive Curretn
(mA)
Power
(W)
Luminous
Efficacy
(lm/W)
Flux(lm)Power FactorDriver
efficacy
Beam AngleLED TypeCCT (K)CRI

LS-TLM31

AC90-305

700

80

105

8400

0.95

91%

90°
Bat wing

Philips
Lumileds

3000
4000
5000
6000

 
70±5
 

920

80

100

8000

920

100

100

10000

1050

100

95

9500

1050

120

95

11400

  
  LS-TLM32

 
AC90-305

700

120

105

12600

0.95

91%

90°
Bat wing

Philips
Lumileds

3000
4000
5000
6000

70±5
 

920

120

100

12000

920

150

100

15000

1050

150

95

14250

1050

180

95

17100

 
 
LS-TLM33

  
 
AC90-305

700

160

105

16800

0.95

91%

 90°
Bat wing

 Philips
Lumileds

 3000
4000
5000
6000

70±5
 

920

160

100

16000

920

180

100

18000

920

200

100

20000

1050

180

95

17100

1050

240

95

22800

 
 
 
Mechanical and Environmental Specification of  M3 Led tunnel light
 
ModelOperation
Temperature
Stock
Temperature
Lifetime
(hrs)
Housing
Material
Surge ProtectionProduct Size (mm)Package Size (mm)N.W(kg)
LS-TLM31-40ºC~+50ºC
10%~90%RH
-40ºC~+50ºC>50000
 Aluminum
Alloy
10KV170*340*230325*155*2454.4
LS-TLM32250*340*230325*235*2455.4
LS-TLM33330*340*230325*315*2456.4

 
 
Features
 Modular pluggable technology, easy-tool onsite maintenance;
 Honeycomb briquette burning effect and the whole structure cooling technology;
 Double-coupling IP68 protection for module, highest waterproof level;
 Ergonomic light distribution to achieve even illuminating effect;
 Free serialization and various power solutions.
 
Special Technical Advantages of M3 Led tunnel light
1.Honeycomb Briquette effect
2.Heat Dissipation of the whole structure
3.Easy-tool Maintenance.
4.Double-coupling IP68 protection.
5.High-effecacy led light source.
6.Free serialization.

 
Maintenance of  M3 Led tunnel light
Step 1:Disconnect the waterproof connectors;
Step 2: Loosen the screws at both ends of the failed module(s)/driver(s);
Step 3: Replace the failed module(s)/driver(s) with qualified one(s);
Step 4: Tighten up the screws at both ends of the module(s)/driver(s) and the waterproof connectors.
  
 
Ordering Information of  M3 Led tunnel light
ModelQty of
modules
WattCCTColorsBeam AnglePower Cord
M31
2
3
80/100/120
120/150/180
200/240
30=3000K
40=4000K
50=5000K
60=6000K
BK=Black
GY=Gray
1=90°
2=Bat wing
GB=China Standard
CB= International Standard
UL=EU Standard

 
Applications 
tunnel, road way, bulidings


Payment Terms:
1. Samples: Bank TT, 100% payment in advance;
2. Bulk order: Bank TT, 30% deposit and balance 70% settled before shipment.


Delivery time:
1. Samples: 3-7 working days;
2. Bulk order: 7-15 working days.


Warranty:
5 years warranty


Shipping Method:
1. By Express: DHL, UPS, Fedex, a fast and safe way for shipping, normally 3-5 working days for delivery;
2. By Air: In some area, the shipping cost by air is more favorable than by Express; 5-7 days for delivery
3. By Sea: the most economic shipping method, but cost longer shipping time; large quantity, heavy and not urgent goods can choose this way.
4. Your shipping agent or forwarder.


After-sale Service:
1. Quick reply on customers' questions;
2. If anything goes wrong with the products'quality, we will replace for you free and undertake the shipping cost.
3. Make you a happy ordering.

Welcome your inquiry!
Send your message to this supplier
Avatar
Ms. Vicky
*From:
To: Ms. Vicky
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category